Client: West Sussex CC
Value: £18m
Duration: 18 months
Jackson was appointed as main contractor on this scheme, which involved a design and build upgrade of the existing single carriageway A2300 to a dual carriageway, linking the Sussex town of Burgess Hill to the A23/M23 strategic road.